Surface Preparation

CSCS/CPCS and NVQ accredited SURFACE PREPARATION

We undertake all types of surface preparation works of varying sizes on highways, airfields/airports, car parks, retail locations, ports and any location where industrial surface preparation is needed including new construction sites ore renovation/remodelling projects.

 

Surface preparation is carried out on a variety of surfaces usually to prepare the surface for a new coating or new lining. Surface preparation is utilised to ensure the condition of the surface being treated is adequate and has sufficient key for the new material or coatings to be applied.

Innovation Techniques & Specialist Team

Our techniques, which include recent innovations and standard techniques, can be used on concrete, asphalt and steel surfaces.

 

Our specialist and experienced team, based out of Saxilby in Lincolnshire are all CSCS/CPCS and NVQ accredited. Our works project varies from anti-skid, waterproofing removal and line marking removal to tamp removal and planing or scarifying across a number of private and public sector establishments.

 

Allied offers surface preparation techniques utilising planers, polyplaners, scarifiers, walk behind blasting captive blasting, runway grooving and diamond retexturing.

Our Surface Preparation Division Carry Out Projects That Consist Of:

  • – Preparing for the refurbishment of car parks, bridge decks, highways and runways
  • – Steel preparation
  • – Removal of asphalt, concrete and anti-skid
  • – Retexturing of surfaces to bring back skid resistance
  • – Removal of laitance on new concrete
  • – Removal of screed, latex, resins, paints, vinyls and carpets

 

Tel: 01942 673006

Email: info@alliedinfrastructure.co.uk

Or, why not visit our contact us page for more information.

X

Fill in the form below to get access to this product's PDF overview.